DANVILLE — Danville Village Council took one more step Monday toward improving its wastewater system.
Council members voted to approve two resolutions accepting bids for wastewater treatment plant pump station/electrical improvements and for manhole lid replacement during its meeting Monday.
Amelcon LLC’s bid of $80,175 was approved for the pump station/electrical improvements.
The work will include: Repair of the check valves on the permanent pump station; replacement of the tubes and fittings on the pump station gauges; replacement of wear plates on the permanent pump station; cleaning and repainting of the pump station; mounting of the control panel on the stand-by pump; construction of an electrical access vault on the existing buried electrical conduits to eliminate the water that is flowing through these conduits and into the pump building; re-mounting of electrical junction boxes on the cable anchor posts; replacement of the flexible conduit and wiring to the floating aspirators in the lagoon; and demolition and reconstruction of the five existing electrical disconnect enclosures near each lagoon.

